Thursday 9th February 2012

Year 1997




  • The Technology Park, seen from the South East, Building 210 (ZIV) was under construction in the background.
  • Building 224 (Air Liquide) was built in 1997.
  • Birds eye view of Buildings 224 and 300. The land where Building 302 (Sew Eurodrive) was going to be located was started to be prepared next.
  • Building 224, once finished.
  • Work on Building 210 being finished off.

In 1997, the building of Building 224 was concluded, and the land where Building 302 would be located was started to be prepared (Sew Eurodrive).

Developer: Nextel S.A.
© 2007 Parque Tecnológico de Bizkaia

XHMTL

Science and Technology Park of Bizkaia
Parque Tecnológico, S.A. Ibaizabal bidea
Edificio 101. 48170 Zamudio (Bizkaia)
Tel: 94 403 95 00 - Fax: 94 403 95 10
parque-tecnologico@parque-tecnologico.net